What are the installation steps for ductile iron pipes

Mar 20, 2022

1. Site selection. Select the installation route of the ductile tube from the perspective of soil quality and nearby pipelines, and form construction drawings. Special attention should be paid to avoid some corrosive and unsafe installation routes.

2. Large-scale equipment such as excavators and hoists are needed in the pipe laying process. At the same time, according to experience, a ductile pipe with a length of 10 meters is suitable for 2 to 3 workers to cooperate with the pipe laying. The rubber ring should be placed in the socket groove and compacted by hand.

3. Determine the distance of the pipeline. In this link, the main pipe that is too long is cut off, and the socket end is processed into a groove shape according to the construction angle to facilitate application.

4. Tube body measurement, through the measurement of the tube body to determine the straight line clearance and corner clearance formed by the installation arc, vacancy, transfer, etc., in order to achieve stability and avoid displacement.

5. Positioning markings. The purpose of positioning the marking line is to achieve that the axis line of the fixed pipe and the moving pipe is on the same straight line as a wheelbase. This link is to ensure the quality and speed of the installation, and to avoid the pipe rubber ring falling off and affecting the quality and progress.