1. Trench excavation
The bottom width of the groove should be calculated as follows: B=D1+2(b1+b2)
In the formula: B—the excavation width at the bottom of the pipe trench (mm) D1—the outer edge width of the pipe structure (mm) b1—the working face width on one side of the pipe (mm) b2—the supporting width on one side of the pipe (mm)
2. Groove support
The design is based on factors such as trench soil quality, groundwater, slotted section, load conditions, etc. It is required to be firm, to prevent landslides, and the support must not hinder the down pipe and stabilized pipe.
3. A buttress should be provided at the vertical or horizontal turn of the T-joint pipeline. The size of the buttress shall be determined by calculation according to factors such as pipe diameter, rotation angle, working pressure, etc.
4. When transporting drinking water, the pipeline should not pass through the poison-contaminated area, and protective measures should be taken when passing through.
5. For ductile iron pipelines connected by sockets and sockets, the buttresses are calculated and designed, refer to the architectural standard design atlas 03SS505 "flexible interface water supply pipeline buttresses".
6. For the external corrosion coating of ductile iron pipes, galvanized and epoxy asphalt coatings or coatings should be selected according to the soil conditions of the pipe laying site.
7. After the pipeline is installed and the pressure test is qualified, it is advisable to rinse with low chloride ion water and 0.03% potassium permanganate aqueous solution.
8. The rubber ring should be placed in the socket groove and compacted by hand.
9. When the pipe needs to be shortened and then installed, the spigot end should be processed into a groove shape.
10. When the curved section is installed by using the corner of the pipe interface, the pipe should be installed along a straight line first, and then turned to the required angle. During the installation process, it is necessary to use small wooden blocks on the outside of the arc to stabilize the paved pipe body to avoid displacement.
11. During the installation process, the axis lines of the fixed tube and the movable tube should be in a straight line, otherwise the rubber ring will be easily pushed out, which will affect the quality and speed of the installation.
12. The installation of pipes should be flat, and the pipes should be in a straight line. Be careful when there is an inclined angle.
13. Align the interface of the connecting pipe with the socket. If the insertion resistance is too large, do not force it to prevent the rubber ring from twisting.
14. When the pipeline installation and laying project is interrupted, the pipe opening should be closed with its cover to prevent soil and sand and other debris from flowing into the pipeline.
15. The middle part of each pipe should be properly covered with soil before the pressure test.